Lianyungang Center For Disease Control And Prevention
Coordinates: Lianyungang, Jiangsu
Construction year: 2023 (under construction)
Construction volume: The project covers an area of 19,042㎡, with a total construction area of 27,911.38㎡. The main buildings are a laboratory building with 3F on the south side of the main body and 4F on the north side, a comprehensive business building with 9F, sewage treatment station, basement, and laboratory building area It is 8900㎡, with a total of 4 floors, including physical and chemical laboratories, microbiology laboratories, P2 laboratories, etc.
Service content: laboratory functional partition, centralized gas supply system, power system, water supply and drainage system, bearing equipment and auxiliary facilities, automation control, pure water system, microbial purification system, power supply equipment for experimental instruments, cold storage system, etc.